Decoration strategy| How to install PVC panel?

Editor:Haining Haowang Group Co.,Ltd. │ Release Time:2022-10-12 

PVC Ceiling Panel, also known as overhead guard, which plays a very important role in home decoration. Not only can play a beautiful role, but also has the characteristics of moisturizing, sound absorption, heat insulation and so on. It is also the shelter of  the chandelier and bath heater wires, so almost every space will be installed with a ceiling, and the most popular one is the PVC plastic panel ceiling. So how to install PVC plastic panel ceiling ? What are the installation steps of plastic panel ceiling ? Let 's take a look together.

PVC panel

Installation process

Elevation of elastic line → installation of main keel → installation of boom → installation of side keel → installation of plastic gusset plate → cleaning site.

pvc ceiling panel

Installation steps

1. To install a pvc plastic panel ceiling, the first step is to determine the location of the ceiling, that is, the height of the ceiling. Usually the ceiling should not be too low, the height will make the space appear depressing. After determining the installation height, use the ink line to play the elevation on the surrounding wall, and the reference line should be clearly marked .

2. Determine the size and specification of the plastic gusset according to the ceiling design and ceiling area .

3. Determine the keel position line. Because the keel is mainly used to support the shape and fixation of the outer decorative material, in order to ensure the integrity of the installation, the structural size and position line of the keel are determined according to the panel specifications, and the size of the plastic gusset has been determined. The position line is marked above the reference line .

4. Main keel installation. The distance between the main keel hanging points should be selected according to the design recommended series. The middle part should be arched, and the keel arching height should not be less than 1/200 of the room surface span. Correct the position and height in time after the main keel is installed. Pull out the vertical and horizontal elevation control lines, start from one end, and adjust the suspension height of the boom while installing to control the leveling of the dragon skeleton. After the large surface is flat, adjust some single keels with curved edges until the flatness meets the requirements. When installing the main keel, also pay attention to leave the exit of the lighting line .

5.Install the boom. The installation of the boom should meet several requirements: first, the boom should be straight and have sufficient bearing capacity ; secondly, the boom should be rust-proofed in advance; the boom should not exceed 300mm from the end of the main keel, otherwise the boom should be added. , If you need to add a boom, it is best to lap and weld firmly to avoid the main keel from falling .

6.Side keel installation. The side joists should be installed snugly against the main joists. After installing the main and side keels, check the flatness and firmness of the keels .

7.Plastic gusset installation. Fasten the plastic gusset on the keel in parallel by one strip, and connect it with a special connector. It should be noted that when installing the last board, it should be cut with a cutter according to the final actual size, the panel should be slightly bent and installed, and finally sealed with pressure strips on both sides.

Installation Precautions

1. After the wall tiles of the kitchen and bathroom are posted, you can notify the gusset manufacturer to come and measure.

2.The electric water heater and the gas water heater are installed in place. And the power lines for lighting, exhaust, etc. should be reserved.

3.Before installing the ceiling, buy the bath heater exhaust fan (not required for the integrated ceiling), and get it to the site. The opening position of the exhaust hood smoke pipe is determined with the cabinet manufacturer.

4.Ceiling lamps, if they are embedded, should be bought and brought to the scene, ordinary ones are not needed.

5.Please confirm the installation position of the above electrical appliances so that the installation workers can open the holes.

6.Now most of the windows of the balcony kitchen and bathroom are lower than the size of the ceiling. Please prepare a wood board (or kitchen cabinet board) so that the ceiling installer can seal these parts.


国产一区二区三区视频免费在线| 91麻精品国产91久久久久| 国产一区二区在线激情往| 亚洲区成人综合一区二区| 国产欧美精品一区二区三区-老狼| 国产美女久久久亚洲综合| 一级做a爰全过程免费视频| 黄色三级毛片网站| 中文字幕无码不卡免费视频| 亚洲精品色国语对白在线| 亚洲成人av一区免费看| 国产91丝袜在线观看| 热久久99精品这里有精品| 天堂av在线一区二区| 亚洲乱亚洲乱妇在线| 97超碰精品成人国产| 在线观看国产精品日韩av| 人妻系列无码专区69影院 | 嫩草研究院久久久精品| 无码小电影在线观看网站免费| 中文字幕少妇人妻精品| av在线手机播放| 亚洲国产日韩欧美在线| 日韩精品人妻中文字幕| 国产黄色三级三级看三级| 中文字幕乱码亚洲精品一区| 在线观看91精品国产秒播| 久久精品国产亚洲欧美| 自拍欧美亚洲| 久久亚洲国产成人亚| 欧美z0zo人禽交另类视频| 成年女人片免费视频播放A| 看全色黄大色大片免费久久| 成年片色大黄全免费网站久久 | 日本韩国一区二区精品| 天天摸天天透天天添| 亚洲自偷自偷偷色无码中文| 国产99精品久久| 日本在线a一区视频高清视频| 少妇高潮喷水正在播放| 高清破外女出血AV毛片|