Decoration strategy| How to install PVC panel?

Editor:Haining Haowang Group Co.,Ltd. │ Release Time:2022-10-12 

PVC Ceiling Panel, also known as overhead guard, which plays a very important role in home decoration. Not only can play a beautiful role, but also has the characteristics of moisturizing, sound absorption, heat insulation and so on. It is also the shelter of  the chandelier and bath heater wires, so almost every space will be installed with a ceiling, and the most popular one is the PVC plastic panel ceiling. So how to install PVC plastic panel ceiling ? What are the installation steps of plastic panel ceiling ? Let 's take a look together.

PVC panel

Installation process

Elevation of elastic line → installation of main keel → installation of boom → installation of side keel → installation of plastic gusset plate → cleaning site.

pvc ceiling panel

Installation steps

1. To install a pvc plastic panel ceiling, the first step is to determine the location of the ceiling, that is, the height of the ceiling. Usually the ceiling should not be too low, the height will make the space appear depressing. After determining the installation height, use the ink line to play the elevation on the surrounding wall, and the reference line should be clearly marked .

2. Determine the size and specification of the plastic gusset according to the ceiling design and ceiling area .

3. Determine the keel position line. Because the keel is mainly used to support the shape and fixation of the outer decorative material, in order to ensure the integrity of the installation, the structural size and position line of the keel are determined according to the panel specifications, and the size of the plastic gusset has been determined. The position line is marked above the reference line .

4. Main keel installation. The distance between the main keel hanging points should be selected according to the design recommended series. The middle part should be arched, and the keel arching height should not be less than 1/200 of the room surface span. Correct the position and height in time after the main keel is installed. Pull out the vertical and horizontal elevation control lines, start from one end, and adjust the suspension height of the boom while installing to control the leveling of the dragon skeleton. After the large surface is flat, adjust some single keels with curved edges until the flatness meets the requirements. When installing the main keel, also pay attention to leave the exit of the lighting line .

5.Install the boom. The installation of the boom should meet several requirements: first, the boom should be straight and have sufficient bearing capacity ; secondly, the boom should be rust-proofed in advance; the boom should not exceed 300mm from the end of the main keel, otherwise the boom should be added. , If you need to add a boom, it is best to lap and weld firmly to avoid the main keel from falling .

6.Side keel installation. The side joists should be installed snugly against the main joists. After installing the main and side keels, check the flatness and firmness of the keels .

7.Plastic gusset installation. Fasten the plastic gusset on the keel in parallel by one strip, and connect it with a special connector. It should be noted that when installing the last board, it should be cut with a cutter according to the final actual size, the panel should be slightly bent and installed, and finally sealed with pressure strips on both sides.

Installation Precautions

1. After the wall tiles of the kitchen and bathroom are posted, you can notify the gusset manufacturer to come and measure.

2.The electric water heater and the gas water heater are installed in place. And the power lines for lighting, exhaust, etc. should be reserved.

3.Before installing the ceiling, buy the bath heater exhaust fan (not required for the integrated ceiling), and get it to the site. The opening position of the exhaust hood smoke pipe is determined with the cabinet manufacturer.

4.Ceiling lamps, if they are embedded, should be bought and brought to the scene, ordinary ones are not needed.

5.Please confirm the installation position of the above electrical appliances so that the installation workers can open the holes.

6.Now most of the windows of the balcony kitchen and bathroom are lower than the size of the ceiling. Please prepare a wood board (or kitchen cabinet board) so that the ceiling installer can seal these parts.


天堂а√在线最新版中文下载| 免费特黄夫妻生活片| 国产成人亚洲欧美二区综合| 婷婷99视频精品全部在线观看| 亚洲男女免费视频| 偷窥少妇久久久久久久久| AV极品无码专区亚洲AV| 日韩免费无砖专区2020狼| 最新精品露脸国产在线| 潘金莲高清dvd碟片| 无码h肉在线观看免费一区| 丰满爆乳一区二区三区| 青青草国产精品亚洲专区无码 | 人妻va精品va欧美va| 国产婷婷精品av在线| 一本一道精品欧美中文字幕| 国产在线白浆一区二区三区在线| 欧美人成精品网站播放| 中文一区二区视频| 无码人妻精品一区二| 国产网友愉拍精品视频手机| 欧美精品综合视频一区二区| 九九久久精品免费观看| 狠狠躁夜夜躁无码中文字幕 | 国产成人AV男人的天堂| 91情侣在线精品国产免费| 最近中文字幕mv免费高清在线| 韩国三级高潮爽| 国内精品国产三级国产a久久| 黄色大全免费看国产精品| 波多野结衣的av一区二区三区| 麻豆国产在线精品国偷产拍| 国产品精品久久久久中文| 国产精品流白浆无遮挡| 中文字幕亚洲乱码熟女在线萌芽 | 国产激情A∨在线视频播放| 国产精品999在线| 亚洲综合网一区中文字幕| 欧美激情综合色综合啪啪五月| 免费的国产成人av网站装睡的| 奶头好大揉着好爽视频|